EnglishPolishMagyar

Articles

Process Downtime Level

Process Downtime Level measures the extent to which an operational process is available and running.

Process Downtime Level = (TA t / PPT t) x 100

Where:
PPT t is the planned productive time that a process should be available in a given time period t.
TA t is the actual productive time that a process has been available in a given time period t.

FacebookTwitter

Kontakt

This email address is being protected from spambots. You need JavaScript enabled to view it.
tel: +44 741 480 7431
tel: +48 12 3410069
tel: :+48 509 259 329

Support

If you have any questions or you need support:

we are available Mondays to Fridays from 9 am to 5 pm (CET)

This email address is being protected from spambots. You need JavaScript enabled to view it.
Call us